top of page
CR LOGO.png

House in Alella | 2024

Complete renovation of a house from 1973.

We completed the entire turnkey project of a 400 m2 building distributed over 3 floors. The layout was modified to maximize natural light and views with large windows. The facade was constructed using an External Thermal Insulation Composite System (ETICS).

bottom of page